News · Waterloo, Ontario
Published
ION LRT in Waterloo: Not Just Bikes Calls It So Good It Made Him Angry
Not Just Bikes, a YouTube channel about cities with more than a million views on this video alone, posted "This Small City's LRT is so Good it Made me Angry" on October 28, 2026, praising Waterloo Region's ION light rail. Locals mostly agree the ION is a success (95.3% on time in 2025, trains every 10 minutes on weekdays), but pushed back on the "small city" label, claims about Uptown Waterloo and the smooth-construction story, and still argue over the walk at Fairway station.
Facts checked
In this story

A million people just watched a video about the ION
Waterloo Region has been called a lot of things. "Small town" isn't usually one of them, and the people who live here would like a word.
On October 28, 2026, Not Just Bikes, a popular YouTube channel about city design and transit, posted a 25-minute video called "This Small City's LRT is so Good it Made me Angry." The subject was the ION, the light rail line that runs through Waterloo and Kitchener. Within four weeks it had more than a million views.
The gist, as viewers described it: the ION is the rare Ontario transit project that actually worked, and that's exactly why it's maddening that the rest of the province can't pull it off. The video's own thumbnail says it plainly. "They actually did it!"
You'd think a million-view compliment would get a warm welcome. It got about 150 replies, and most of them had notes.

Source: Not Just Bikes: This Small City's LRT is so Good it Made me Angry (YouTube, October 28, 2026)
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
The ION LRT by the numbers
Some quick facts first. The ION's first stage opened on June 21, 2019, about 18 months late, mostly because Bombardier delivered the trains late. It runs about 19 kilometres between Conestoga Mall in Waterloo and Fairway station beside Fairview Park Mall in Kitchener, with 19 stations. The estimated cost was about $818 million, paid by all three levels of government.
Trains come every 10 minutes on weekday daytimes and every 15 minutes evenings and weekends. In 2025 the ION was on time 95.3% of the time. Buses in the region managed 73.8%.
It isn't fast. A trip end to end takes about 43 to 44 minutes, an average of roughly 22 km/h, according to the local transit group TriTAG. That beats Toronto's streetcars by a mile and trails Calgary and Edmonton. TriTAG blames fixable things: a slow zone near Willis Way left over from a 2024 freight derailment, an unprotected pedestrian crossing near Fairway that forces trains down to about 20 km/h, and safety beacons that brake trains early before stations.
| ION fact | Number |
|---|---|
| Opened | June 21, 2019 |
| Length | About 19 km |
| Stations | 19 |
| Weekday daytime frequency | Every 10 minutes |
| On time in 2025 | 95.3% |
| End-to-end trip | About 43 to 44 minutes |
Conestoga ION station (Conestoga Mall)
550 King Street North, Waterloo, ON N2L 5W6
Northern end of the line, at Conestoga Mall.
Source: Wikipedia: Ion rapid transit
Source: Wikipedia: Ion rapid transit
Source: Sean Marshall: Ion, an Ontario LRT that somehow works (January 19, 2026)
Source: TriTAG: On the fast track, how to make ION even faster (February 22, 2026)
"Small city"? Waterloo Region pushes back
The title alone set people off. One person pointed out the region is about the tenth biggest metro area in Canada. Another offered the local version: "We are but 500,000 simple farmers. Driving our horse and buggies."
Others defended the label. Kitchener on its own is around the 20th biggest city in Canada and Waterloo much further down the list, one person noted, and next to the world's big cities, the whole region is small. Since the channel's audience is international, they said, "small city" is fair. Someone else said the region is the smallest metro area in North America with light rail, which, if true, is the whole point of the video.
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
Uptown Waterloo was never "downtown"
The biggest grudge was about Uptown. Viewers said the video suggested Uptown Waterloo used to be pretty grim, that it's "now called Uptown," and that Waterloo Town Square was added recently. That did not go down well.
Locals said Uptown has been Uptown for a very long time. One person said the nickname goes back to the early 1900s, with official branding in the 1980s, and pointed to a letter in The Record making the case. Another remembered it as downtown Waterloo at some point decades back. Most agreed it was certainly Uptown when the video's host was at university here. As for "used to be shitty," one person said Uptown wasn't always as nice as it is now, but the Huether was fine, and maybe he was thinking of downtown Kitchener.
How rude was the video, really? One local said the host called their home shitty about 30 times. Another went and checked the transcript and counted twice in 22 minutes. Somewhere between those two numbers is the truth, and probably a lot of hurt feelings.

Waterloo Public Square ION station
King Street South between Willis Way and Erb Street, Waterloo, ON
Uptown Waterloo's northbound stop, beside Waterloo Town Square.
Source: Wikipedia: Waterloo Public Square station
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
Source: Wikipedia: Waterloo Public Square station
Did ION construction really go smoothly?
The video said the build went smoothly. People who lived through it laughed.
One resident who remembers it well listed the problems: Uptown businesses that struggled with closures and poor communication, a two-year late start, and a lawsuit still in court. That last part checks out. In July 2026 GrandLinq, the group that built ION, sued the Region of Waterloo for $110 million, saying the Region caused delays with late utility work and land deals. Those claims haven't been tested in court. The late trains were a separate fight, settled years ago, with Bombardier paying the Region $2.2 million and throwing in an extra train.
Others said the critics were overdoing it. Most Ontario construction projects run late and over budget, one person said, and ION had fewer problems than recent Toronto light rail builds. The two-year delay at the end was about trains, not track. Someone who was here for the whole thing said both sides were overstating it. And one person who called the build a nightmare said they'd still choose to have it built, all over again.
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
Source: CTV News Kitchener: Region of Waterloo to get $2.2 million for LRT delivery delays
Fairway station and getting around with a disability
The most serious argument was about Fairway, the south end of the line. Viewers said the video blasted the walk from the train to Fairview Park Mall, saying it takes independence away from people with disabilities. Accessibility advocates raised the same complaint when the line opened in 2019, and the Region added a second crosswalk that fall.
Locals didn't agree on how bad it is. One person said the station is about 100 metres from the nearest mall entrance. Another said 100 metres is exactly the problem if you can't walk well, and wondered whose interest was served by letting riders off by the Leon's loading dock. A resident with a disability who can't drive said they rewatched the video and thought the host "nailed it," rant and all.
Another person argued that any transit rider depends on someone else, so a closer stop makes life easier but doesn't create independence. The reply came quickly: for people who can't drive, a train that comes every 10 minutes with level boarding is about as independent as it gets. One Cambridge resident said people sleep on that part of light rail. No ramps to deploy, lots of room, fewer transfers.
Fairway ION station (Fairview Park Mall)
Wilson Avenue at Fairway Road South, Kitchener, ON
South end of the line, beside Fairview Park Mall. Bus terminal and 302 ION Bus to Cambridge.
Source: Wikipedia: Fairway station
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
Source: Wikipedia: Fairway station
The bike lanes got the real applause
Cyclists were the happiest people in the conversation. A cyclist who spent a weekend riding around Kitchener-Waterloo with a group said the region is way ahead of the rest of Ontario: separated two-way paths, underpasses below highways, curb cuts into neighbourhoods and good signs. Someone who has biked to work year round for five years said the jump in bike commuters is astonishing.
There were complaints too. Secure bike parking is thin, though people pointed to a secure spot in the parking garage across from Waterloo Town Square, bike cages in Kitchener garages and volunteer bike valets at downtown Kitchener events. The Iron Horse and Spur Line trails still cross roads with no raised crossings, and in places no paint. And three governments (Kitchener, Waterloo and the Region) each run part of the network with different priorities, one rider said, though others said the Region has come a long way in the last decade.
One more design gripe kept coming up. ION switches between running in the middle of the street and along the curb, and one driver wondered if keeping it in one spot would mean fewer crashes. Another replied: attentive driving would.
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
Did the ION help Waterloo, or mostly developers?
Not everyone thinks the ION was a win. One long-time rider said the trip between the two malls takes about 45 minutes on the ION, the same as the old Route 12 bus that also covered more ground. In their view the real winners were developers and investors, and cheap housing along the line was pushed out as rents rose.
Others answered that a train every 10 minutes that ignores traffic jams beats any bus, and that the line serves many people who can't afford a car or can't drive. One planner said ION succeeded because of its compromises, and that perfect was never an option. A local urbanism fan added that the building boom along the line started before the ION was even approved, thanks to development incentives, and that the video missed Northdale, near the universities, where the city dropped density limits in a low-rise neighbourhood. That story may deserve its own video.
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
What's next: ION to Cambridge
Stage 2 would carry ION 17 kilometres from Fairway to downtown Cambridge, with seven new stations. Regional council approved it in November 2025. The money isn't there yet: the Region is asking Ottawa and the province to pay for it, and the project is in design.
Cambridge supporters were nervous after a mayoral town hall where one speaker got, in a resident's words, almost everything about the LRT wrong. Some felt better after Cambridge elected Scott Hamilton as mayor in October, unseating Jan Liggett, whom one resident called an opponent of Stage 2. Others worry the price only goes up the longer it waits. One person recalled possible future lines along Ottawa Street or University Avenue, but those are only ideas for now.
Our read: the ION gets the debate it does because people use it. As one local put it, nobody fights this hard over something nobody uses.
Source: Region of Waterloo: Stage 2 ION
Source: CTV News Kitchener: Scott Hamilton promises a fresh start as Cambridge's next mayor (October 2026)
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
More place details
Source: Compare these places in Resources
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
Questions people ask
What did Not Just Bikes say about Waterloo's ION LRT?
Not Just Bikes' video "This Small City's LRT is so Good it Made me Angry," posted October 28, 2026, praises Waterloo Region's ION light rail as an Ontario transit project that works, while criticizing choices such as the walk at Fairway station.
Source: Not Just Bikes: This Small City's LRT is so Good it Made me Angry (YouTube, October 28, 2026)
How long is the ION LRT in Waterloo Region?
The ION LRT runs about 19 kilometres with 19 stations, from Conestoga Mall in Waterloo to Fairway station beside Fairview Park Mall in Kitchener.
Source: Wikipedia: Ion rapid transit
When did the ION LRT open?
The ION LRT opened on June 21, 2019, about 18 months late, mainly because Bombardier delivered the trains late.
Source: Sean Marshall: Ion, an Ontario LRT that somehow works (January 19, 2026)
How often does the ION train run?
The ION train runs every 10 minutes on weekday daytimes and every 15 minutes on evenings and weekends, dropping to every 30 minutes late at night.
Source: Sean Marshall: Ion, an Ontario LRT that somehow works (January 19, 2026)
How long does the ION take from Conestoga Mall to Fairview Park?
The ION takes about 43 to 44 minutes from Conestoga station in Waterloo to Fairway station in Kitchener, an average of about 22 km/h.
Source: TriTAG: On the fast track, how to make ION even faster (February 22, 2026)
Is the ION LRT on time?
Yes, mostly. The ION LRT was on time 95.3% of the time in 2025, compared with 73.8% for Grand River Transit buses.
How much did the ION LRT cost?
The first stage of the ION LRT was estimated at about $818 million, shared by the federal, provincial and regional governments.
Source: Wikipedia: Ion rapid transit
Is the Region of Waterloo being sued over the ION?
Yes. In July 2026 GrandLinq, the consortium that built the ION, sued the Region of Waterloo for $110 million over construction delays. The claims have not been proven in court.
Has Uptown Waterloo always been called Uptown?
Locals say Uptown Waterloo has been called Uptown informally for about a century, with official branding since the 1980s, which is why they objected when the Not Just Bikes video suggested the name was new.
Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026
Where is the ION stop in Uptown Waterloo?
Waterloo Public Square station is on King Street between Willis Way and Erb Street in Uptown Waterloo. It serves northbound trains only; southbound trains stop at Willis Way station, about 200 metres away.
Source: Wikipedia: Waterloo Public Square station
When will the ION go to Cambridge?
No date is set. Regional council approved the 17-kilometre Stage 2 ION extension to downtown Cambridge in November 2025, but the Region is still seeking full funding from the federal and provincial governments.
Source: Region of Waterloo: Stage 2 ION
Why is the ION LRT slow in places?
The ION LRT is slowed by a leftover slow zone near Willis Way, an unprotected crossing near Fairway, safety beacons that brake trains early before stations and tight curves, according to the transit group TriTAG.
Source: TriTAG: On the fast track, how to make ION even faster (February 22, 2026)
Something changed? Tell us about a correction.