ION light rail stations in and near Waterloo

Waterloo, Ontario, Canada

A researched shortlist for Waterloo, Ontario. Compare addresses, practical details and maps.

Key information

This is a growing shortlist. Each place has its own source and address. Read the article for comparisons and dated community opinions.

On this page

Place details and maps

Waterloo Public Square ION station

King Street South between Willis Way and Erb Street, Waterloo, ON

The ION light rail stop in Uptown Waterloo, at the north end of Waterloo Public Square beside Waterloo Town Square. Northbound trains only; southbound trains stop at Willis Way station, about 200 metres away.

Direction
Northbound only
Southbound
Willis Way station, about 200 m away
Opened
June 21, 2019
Useful for
Uptown Waterloo shops, restaurants and the public square
Before visiting
One direction only; walk to Willis Way for southbound trains.

Sources: Wikipedia: Waterloo Public Square station

Conestoga ION station (Conestoga Mall)

550 King Street North, Waterloo, ON N2L 5W6

The northern end of the ION light rail line, at Conestoga Mall in north Waterloo.

Line
301 ION, about 19 km to Fairway
Trip to Fairway
About 43 to 44 minutes
Useful for
Conestoga Mall; north Waterloo
Before visiting
End of the line; check the last train time late at night.

Sources: Wikipedia: Ion rapid transit

Fairway ION station (Fairview Park Mall)

Wilson Avenue at Fairway Road South, Kitchener, ON

The southern end of the ION light rail line, beside Fairview Park Mall in Kitchener, with a bus terminal and the 302 ION Bus to Cambridge.

Connections
302 ION Bus to Cambridge, iXpress and local buses
Mall
Fairview Park Mall, next door
Useful for
Fairview Park Mall; transfers to Cambridge
Before visiting
Walk from the platform to the mall doors is a sore point for riders with limited mobility.

Sources: Wikipedia: Fairway station

Map searches identify a place and address. They do not verify entrances or step-free routes.

Plan your visit

Useful questions

What did Not Just Bikes say about Waterloo's ION LRT?

Not Just Bikes' video "This Small City's LRT is so Good it Made me Angry," posted October 28, 2026, praises Waterloo Region's ION light rail as an Ontario transit project that works, while criticizing choices such as the walk at Fairway station.

Source: Not Just Bikes: This Small City's LRT is so Good it Made me Angry (YouTube, October 28, 2026)

How long is the ION LRT in Waterloo Region?

The ION LRT runs about 19 kilometres with 19 stations, from Conestoga Mall in Waterloo to Fairway station beside Fairview Park Mall in Kitchener.

Source: Wikipedia: Ion rapid transit

When did the ION LRT open?

The ION LRT opened on June 21, 2019, about 18 months late, mainly because Bombardier delivered the trains late.

Source: Sean Marshall: Ion, an Ontario LRT that somehow works (January 19, 2026)

How often does the ION train run?

The ION train runs every 10 minutes on weekday daytimes and every 15 minutes on evenings and weekends, dropping to every 30 minutes late at night.

Source: Sean Marshall: Ion, an Ontario LRT that somehow works (January 19, 2026)

How long does the ION take from Conestoga Mall to Fairview Park?

The ION takes about 43 to 44 minutes from Conestoga station in Waterloo to Fairway station in Kitchener, an average of about 22 km/h.

Source: TriTAG: On the fast track, how to make ION even faster (February 22, 2026)

Is the ION LRT on time?

Yes, mostly. The ION LRT was on time 95.3% of the time in 2025, compared with 73.8% for Grand River Transit buses.

Source: Region of Waterloo report TSD-TRS-26-001: Grand River Transit Ridership Update, 2025 Year End (February 10, 2026)

How much did the ION LRT cost?

The first stage of the ION LRT was estimated at about $818 million, shared by the federal, provincial and regional governments.

Source: Wikipedia: Ion rapid transit

Is the Region of Waterloo being sued over the ION?

Yes. In July 2026 GrandLinq, the consortium that built the ION, sued the Region of Waterloo for $110 million over construction delays. The claims have not been proven in court.

Source: CTV News Kitchener: Region of Waterloo being sued for $110M over ION construction delays (July 16, 2026)

Has Uptown Waterloo always been called Uptown?

Locals say Uptown Waterloo has been called Uptown informally for about a century, with official branding since the 1980s, which is why they objected when the Not Just Bikes video suggested the name was new.

Source: Waterloo Region residents react to Not Just Bikes' video on the ION LRT, October and November 2026

Where is the ION stop in Uptown Waterloo?

Waterloo Public Square station is on King Street between Willis Way and Erb Street in Uptown Waterloo. It serves northbound trains only; southbound trains stop at Willis Way station, about 200 metres away.

Source: Wikipedia: Waterloo Public Square station

When will the ION go to Cambridge?

No date is set. Regional council approved the 17-kilometre Stage 2 ION extension to downtown Cambridge in November 2025, but the Region is still seeking full funding from the federal and provincial governments.

Source: Region of Waterloo: Stage 2 ION

Why is the ION LRT slow in places?

The ION LRT is slowed by a leftover slow zone near Willis Way, an unprotected crossing near Fairway, safety beacons that brake trains early before stations and tight curves, according to the transit group TriTAG.

Source: TriTAG: On the fast track, how to make ION even faster (February 22, 2026)

Get in touch
My Waterloo

How can we help?